Looking for new MEPCO electricity connection? Let us guide you how you can get that. You can either visit the nearest office and get the application form, or you can apply online.

Mepco New Connection

You will see an easy form where you can choose type of electricity connection, and in the Distribution Company list, make sure to choose MEPCO. Fill all other fields, upload scanned copies of related documents and apply for new connection.

New Connection Procedure:

Here are the steps to apply for new meter connection:

  1. Fill the online application form here.
  2. Upload scanned copies of the following documents:
    (a) Proof of ownership.
    (b) Undertaking by the applicant.
    (c) Power of attorney in case of more than one owner.
    (d) No Objection Certificate (NOC) in case the applicant is a tenant.
    (e) Attested copy of applicant’s CNIC.
    (f) Attested copies of CNIC of two witnesses (not required in case of single phase connection)
    (g) A copy of concerned tariff duly signed by the consumer.
  3. Submit the application form.
  4. Get printed copy of the application form.
  5. Attach copy of all required documents with the application form.
  6. Send the application along with all attachments to the concerned office.
  7. You will receive demand notice after verification of documents.
  8. Now you have to pay the demand notice to the designated bank.
  9. Submit copy of paid demand notice to the concerned office.
  10. The meter connection will be installed after payment verification of demand notice.

If you have applied for new connection, and want to check application status, you can visit the nearest office or call the helpline. If you want to check mepco bill for your new connection, you can check it here.

Estimated time for new connection:

How long it may take to get new mepco meter connection? It depends on connection category. Basically there are 3 main categories of Mepco electric supply connection according to load.

Category – 1 (Up to 15 kW)

Here are steps with estimated number of days to get category-1 connection:

Sr#StepDays
1.Applicant will fill the application form with related papers and submit to nearest office who will issue the receipt and seniority number to the applicant. For this purpose, the office will setup seniority register as per application submission date and applicant will get access to it.1
2.Related officer will visit the place where new connection is required to make sure either it is possible to setup this new connection or not. If not possible, then applicant will be informed.3
3.If it is possible to setup new connection on applicant’s location, then the office will generate estimate cost of connection.2
4After cost estimation, office will issue demand notice which can be picked by hand or sent to applicant by post.2
5Applicant will deposit the demand notice fee to bank and submit a copy to related mepco office.2
6Applicant will submit wiring test report and related office will verify it.3
7The office will prepare the priority list of applicants as per their dues submission date.1
8The office will issue service connection order.3
9The related office will then contact store to get connection items e.g. meter, wire, installation kit etc.3
10The store will provide required items to related office.5
11After receiving connection items, the office of the SDO or Assist. Manager Operation will install new meter connection.5
TOTAL EXPECTED DAYS30

Category – 2 (16 to 70 kW / 400 volts)

The process to get new category-2 mepco connection is almost same as category one, but it can take up to 44 days to complete category 2 connection.

Category – 3 (71 to 500 kW / 400 volts)

Just like category one and two, there are same steps for category 3, however in this category it may take up to 73 days from application submission date to meter installation.